Energy & infrastructure development

Powering infrastructure.
Advancing communities.

TransGlobe Power develops and supports the financing and delivery of energy, transportation, civic, and built infrastructure projects across global markets.

Develop
Design
Build
Maintain

From early development to operating performance.

Complex infrastructure projects require more than a single discipline. TGP connects development, engineering coordination, commercial strategy, construction management, and long-term operations around one project objective.

About TransGlobe Power

Recorded energy project experience.

728 MW

Recorded capacity

Across utility-scale and commercial projects

19 projects

Recorded projects

United States, India and Africa

8 countries

Countries

Across three continents

4 disciplines

Lifecycle coverage

Develop, design, build, maintain

Figures are drawn from TransGlobe Power’s project overview. Capacities are as recorded against each project; US commercial figures are aggregated from individual installations.

Infrastructure across energy, transportation, and the built environment.

View all industries

Decision-ready development

Make the next decision clearer.

Projects advance when assumptions, dependencies, risks, and responsibilities are visible to the people making the next commitment.

Define the opportunity

Clarify the location, sector, demand, resource, stakeholders, schedule, and decision that must be made.

Test feasibility

Review site, resource, interconnection, permitting, technical, commercial, construction, and operating constraints.

Build the delivery plan

Align design, procurement, financing, contracting, project controls, quality, commissioning, and risk ownership.

Protect operating value

Carry documentation, monitoring, maintenance, warranty, performance, and lifecycle needs into execution.

Performance after construction

Long-term value depends on long-term performance.

Commissioning, preventive maintenance (PM), corrective maintenance (CM), and asset oversight help protect production, equipment life, and project economics.

Operations & maintenance

Current policy and market context.

Federal tax-credit rules, interconnection requirements, permitting pathways, and equipment standards continue to change. Our update page summarizes the current federal framework using official sources and identifies what project teams should verify before relying on an incentive or schedule assumption.

Read energy updates

Notes on what actually stops projects.

Interconnection queues, incentive conditions, storage codes and production uncertainty — written from delivery experience, for people making the next decision.

Read the insights

Start with the essentials

Working with TransGlobe Power.

Clear project information creates a faster, more useful initial conversation.

What types of projects does TransGlobe Power work on?

TGP supports energy and utility infrastructure — solar, wind, battery storage, power generation, substations, high-voltage transmission, and industrial energy — as well as roads and highways, rail and transit, civil infrastructure, buildings, healthcare facilities, and education facilities.

At what stage should a project be introduced?

Projects may be introduced during origination, feasibility, development, design, construction planning, commissioning, or operations. The initial review should clearly state the current stage and the next decision required.

What should be included in an initial project inquiry?

Include the location, sector, project type, approximate scale (capacity, project value, square footage, or another measure), development stage, site-control status, utility or interconnection status, known constraints, and the support being requested.

Can TGP support an existing project team?

Yes. TGP can coordinate with an owner’s existing engineers, contractors, suppliers, operators, legal advisers, financial advisers, utilities, and other stakeholders.

How does TGP evaluate a project opportunity?

The review is shaped around site and resource fundamentals, grid access, permitting, technical configuration, commercial logic, delivery readiness, stakeholder alignment, and long-term operating needs.

Your next infrastructure project

Let’s build what communities need next.

Discuss a project