Design

Engineering coordination grounded in project goals.

TGP coordinates system sizing, layouts, and engineered deliverables so energy infrastructure can integrate efficiently with the broader project.

TransGlobe Power

Design

Basis of design

A clear basis of design documents project objectives, operating assumptions, codes, utility requirements, site constraints, major equipment, and system interfaces.

Layout and system integration

Equipment arrangement must account for access, grading, drainage, geotechnical conditions, electrical routing, safety, construction, maintenance, and future operating needs.

Civil and electrical coordination

Cross-discipline coordination helps prevent gaps among foundations, roads, structures, grounding, collection systems, substations, controls, communications, and utility interfaces.

Constructability and design control

Design reviews should confirm scope, interfaces, procurement assumptions, sequencing, field conditions, quality requirements, and change control before construction risk increases.

Working with your design team

TGP works alongside your design team so the energy system meets the project’s goals rather than being fitted around them late. Designers size and lay out solar PV and solar water heating systems and can provide engineered drawings, so the system is coordinated and integrated with the rest of the design instead of coordinated after it.

  • System sizing and layout for solar PV and solar water heating
  • Engineered drawings suitable for coordination and permitting
  • Integration with architectural, structural and electrical design
  • Early constructability input so the design can actually be built as drawn

Clear answers

What to know about design .

What is a basis of design?

It is a controlled document that records the technical assumptions, requirements, criteria, equipment concepts, interfaces, and standards that guide detailed design.

Why is constructability review important?

A design can be technically correct but difficult, costly, unsafe, or slow to build. Constructability review tests how the design will be procured, sequenced, installed, tested, accessed, and maintained.

Who should participate in design coordination?

Participation depends on the project but may include the owner, developer, engineer, utility, equipment suppliers, construction team, operator, permitting specialists, and financing stakeholders.

Design

Discuss the design scope.

System requirements, site conditions, and where the design currently stands.

Email TransGlobe Power

Start a conversation

Bring us the project challenge.

Share the system requirements and site conditions. We will work through the coordination.

Discuss a project